Reorder Point Calculator

The reorder point is the stock level at which you should place a new order with your supplier so it arrives before you run out.

Formula: Reorder point = (Average daily demand × Lead time in days) + Safety stock.

Reorder point FAQ

What's the difference between the reorder point and safety stock?

Safety stock is only one of the reorder point's two components: the extra buffer for unexpected delays or demand spikes. The full reorder point is that buffer plus the demand you'll burn through while the order is in transit. The most common mistake is setting the "reorder point" equal to safety stock alone, without adding the lead-time demand.

Worked example with real numbers

You sell 20 units/day, your supplier takes 12 days to deliver, and you hold 60 units of safety stock. Reorder point = (20 × 12) + 60 = 300 units. When your available stock — what you physically hold or have already committed, not what's on order — drops to 300, place the order: not before, since you'd tie up extra capital, and not after, since you'd risk a stockout.

What if my demand isn't constant (seasonality, spikes)?

This formula assumes stable average demand. If you have clear seasonal peaks (promotions, sales, holidays), calculate the reorder point separately for the high season using that period's average demand, not the yearly average — otherwise you'll enter the season already understocked.

How do I pick a safety stock number if I don't know where to start?

As a starting point, use this site's lead time calculator formula: safety margin ≈ 1.65 × standard deviation of your actual lead time (roughly a 95% service level). If your supplier is very consistent, you can use a smaller margin; if lead times vary a lot, you need more.

Most common mistakes when applying the reorder point

Using the quoted lead time instead of the actual one when a supplier routinely runs late; not updating the reorder point when a product's average demand grows or falls; and applying one reorder point across the whole catalog instead of calculating it SKU by SKU (use the bulk reorder point calculator if you manage many SKUs at once).

I'm already below the reorder point and haven't ordered yet — what now?

Order now, and check whether you can expedite that specific shipment (air freight instead of sea). Then raise the reorder point going forward so it doesn't happen again — it usually means your real demand or your real lead time is higher than what you were assuming.